TAB Works at Security Support Facility Tanajib — 15 Buildings

Testing, Adjusting & Balancing (TAB) · Cloud Seven · Tanajib

Testing, Adjusting & Balancing (TAB)·Job #25/1/1043/1·Tanajib, KSA·2025
Shan Testing TAB team conducting air balancing across 15 buildings at Tanajib

1. Assignment Overview

Comprehensive HVAC Testing, Adjusting and Balancing (TAB) executed for TAB Works at Security Support Facility Tanajib — 15 Buildings in Tanajib on behalf of Cloud Seven. Field teams measured, adjusted, and verified air distribution systems, fan performance, and building pressurization in accordance with industrial project specifications.

2. Scope of Work & Deliverables

  • Review of approved IFC mechanical drawings, AHU/FCU/fan schedules, and site testing readiness checklists
  • Measurement of fan total airflow, external static pressure (ESP), fan RPM, motor voltage, and running amperage
  • Proportional balancing of supply, return, and exhaust air terminals across all designated buildings and control rooms
  • Verification of control room positive pressurization, fresh air make-up rates, and extract fan duty points
  • Preparation of complete TAB handover dossiers including terminal data sheets, marked-up drawings, and valid instrument calibration certificates

3. Field Challenges & Engineering Solutions

Industrial & Oil/Gas Site Compliance

Mobilization and daily field operations adhered strictly to industrial gate-pass, Job Safety Analysis (JSA), LOTO, and work-at-height requirements.

Multi-System Witness Testing

Balancing logs were organized building-by-building and system-by-system to facilitate smooth joint witness verification with main contractor QC and supervising consultants.

4. Key Achievements & Verified Outcomes

Industrial field deployment
Tanajib
Design airflow tolerance
±10%
Full TAB handover report
Approved