Rectification of Airflow and Sound Issues

HVAC Modification & Works · Carrier · Jizan – Najran

HVAC Modification & Works·Job #25/1/1045/1·Jizan – Najran, KSA·2025
Rectification of airflow and sound issues at commercial facility, Jizan

1. Assignment Overview

Investigation and rectification of HVAC airflow and acoustic noise issues across facility zones in Jizan and Najran for Carrier. Work combined targeted ductwork/damper modifications with post-rectification air balancing and sound level verification.

2. Scope of Work & Deliverables

  • Diagnostic measurement of existing supply/exhaust airflows, duct static pressures, and room sound levels (dBA)
  • Identification of noise generation sources across high-velocity branch take-offs, throttling dampers, and terminal grilles
  • Execution of corrective ductwork, damper, and acoustic attenuation modifications in accordance with agreed scope
  • Proportional re-balancing of supply and exhaust air volumes to restore design air change rates and room pressurization
  • Final post-rectification airflow and sound pressure level verification with signed handover report

3. Field Challenges & Engineering Solutions

Balancing Airflow vs. Noise Limits

Reducing terminal air noise without starving room cooling required upstream branch rebalancing and fan speed adjustment.

Before & After Verification

Both initial baseline readings and final post-rectification airflow and dBA readings were recorded to demonstrate resolution.

4. Key Achievements & Verified Outcomes

Airflow & static pressure
Balanced
Terminal noise levels
Reduced
Post-work test report
Verified