Controls & Commissioning Works at GCP-01 & GCP-04 Package-31

Commissioning & Controls · SYSCON · Jafurah

Commissioning & Controls·Job #26/1/1053/1·Jafurah, KSA·2026
Controls and commissioning works at GCP-01 & GCP-04 Pkg-31, Jafurah

1. Assignment Overview

Execution of HVAC controls verification, instrumentation loop checks, and commissioning support across Gas Compression Plants GCP-01 and GCP-04 (Package-31) in Jafurah for SYSCON. Work focused on validating control panel logic, damper and valve actuator responses, and functional sequence operation against approved project schematics.

2. Scope of Work & Deliverables

  • Point-to-point continuity and I/O signal verification for HVAC control panels at GCP-01 and GCP-04
  • Calibration checks and range verification for duct and room temperature, humidity, and differential pressure sensors
  • Stroke testing and fail-safe position verification for motorized fire/smoke, fresh air, and volume control dampers
  • Functional sequence testing of duty/standby unit changeover, alarms, and emergency shutdown interlocks
  • Compilation of signed controls loop test sheets and commissioning records for consultant sign-off

3. Field Challenges & Engineering Solutions

Site Permit & LOTO Coordination

All panel testing and field actuator checks at GCP-01 and GCP-04 were conducted under industrial permit-to-work and electrical Lockout/Tagout (LOTO) controls in coordination with SYSCON site engineers.

Control Sequence Verification

Field setpoints, staging timers, and pressurization differentials were verified directly against approved Package-31 cause-and-effect matrices and control narratives.

4. Key Achievements & Verified Outcomes

Plant packages covered
GCP-01 & 04
Control loops verified
I/O & FPT
Test sheets submitted
Complete