TAB Works Across 35 Buildings — Jafurah Package-2

Testing, Adjusting & Balancing (TAB) · Hyundai Engineering · Jafurah

Testing, Adjusting & Balancing (TAB)·Job #26/1/1066/1·Jafurah, KSA·2026
TAB works of 35 Buildings, Jafurah Package-2, Hyundai Engineering

1. Assignment Overview

Comprehensive HVAC Testing, Adjusting and Balancing (TAB) executed for TAB Works Across 35 Buildings — Jafurah Package-2 in Jafurah on behalf of Hyundai Engineering. Field teams measured, adjusted, and verified air distribution systems, fan performance, and building pressurization in accordance with industrial project specifications.

2. Scope of Work & Deliverables

  • Review of approved IFC mechanical drawings, AHU/FCU/fan schedules, and site testing readiness checklists
  • Measurement of fan total airflow, external static pressure (ESP), fan RPM, motor voltage, and running amperage
  • Proportional balancing of supply, return, and exhaust air terminals across all designated buildings and control rooms
  • Verification of control room positive pressurization, fresh air make-up rates, and extract fan duty points
  • Preparation of complete TAB handover dossiers including terminal data sheets, marked-up drawings, and valid instrument calibration certificates

3. Field Challenges & Engineering Solutions

Industrial & Oil/Gas Site Compliance

Mobilization and daily field operations adhered strictly to industrial gate-pass, Job Safety Analysis (JSA), LOTO, and work-at-height requirements.

Multi-System Witness Testing

Balancing logs were organized building-by-building and system-by-system to facilitate smooth joint witness verification with main contractor QC and supervising consultants.

4. Key Achievements & Verified Outcomes

Industrial field deployment
Jafurah
Design airflow tolerance
±10%
Full TAB handover report
Approved