TAB Works at Fire Station Building — Saudi Aramco

Testing, Adjusting & Balancing (TAB) · Bin Qashash BGate · Turaif

Testing, Adjusting & Balancing (TAB)·Job #26/1/1054/1·Turaif, KSA·2026
TAB work at Fire Station Building, Turaif Aramco

1. Assignment Overview

Third-party HVAC Testing, Adjusting and Balancing (TAB) carried out for TAB Works at Fire Station Building — Saudi Aramco in Turaif (Client: Bin Qashash BGate). All supply, return, and exhaust air systems were proportionally balanced using calibrated digital instrumentation to meet approved mechanical design schedules.

2. Scope of Work & Deliverables

  • Verification of system readiness, filter condition, damper accessibility, and approved mechanical design schedules
  • Baseline and final operating measurements on air handling units, fan coil units, and ventilation fans (CFM/L/s, ESP, RPM, Amps)
  • Proportional air balancing across all supply diffusers, linear slot diffusers, return grilles, and exhaust valves using calibrated flow hoods
  • Identification and documentation of any site airflow restrictions or mechanical snags for rapid contractor resolution
  • Delivery of final stamped TAB Report containing as-found and final balanced readings, fan data sheets, and instrument calibration certificates

3. Field Challenges & Engineering Solutions

Proportional Branch Balancing

Terminals were balanced iteratively starting from the index circuit on each branch to achieve design airflow within ±10% tolerance without excessive damper throttling.

Traceable Handover Documentation

Every terminal grille and unit reading was cross-referenced to the project layout drawings and accompanied by valid laboratory calibration certificates.

4. Key Achievements & Verified Outcomes

Balanced to design criteria
±10%
Digital TAB instruments
Calibrated
Stamped TAB report issued
Complete