TAB Works — Construction of Southern 380/132/33/13.8 kV BSP Substation
Testing, Adjusting & Balancing (TAB) · Alfaneyah EM Co. Ltd. · AlUla

1. Assignment Overview
Third-party HVAC Testing, Adjusting and Balancing (TAB) and room pressurization verification for TAB Works — Construction of Southern 380/132/33/13.8 kV BSP Substation in AlUla (Client: Alfaneyah EM Co. Ltd.). Work verified that switchgear halls, control rooms, transformer/relay rooms, and battery rooms achieved design cooling airflows and safety ventilation rates.
2. Scope of Work & Deliverables
- Pre-balancing review of approved substation HVAC drawings, equipment schedules, and room pressurization matrices
- Duct Pitot-tube traverses and terminal capture hood measurements across supply diffusers, return grilles, and fresh-air intakes
- Proportional adjustment of main and branch volume control dampers (VCDs) to balance airflows within project specification tolerances
- Measurement and adjustment of positive room pressurization differentials (Pa) in switchgear and control rooms to prevent dust ingress
- Verification of dedicated battery room exhaust fan flow rates and compilation of the final stamped Substation TAB Report with calibration certificates
3. Field Challenges & Engineering Solutions
Substation HSE & Electrical Clearance
All testing inside high-voltage substation buildings was executed by safety-inducted engineers under strict electrical permit-to-work and LOTO procedures.
Switchroom Pressurization & Battery Exhaust
Fresh-air make-up dampers and relief paths were balanced alongside supply fans to maintain positive room pressure while verifying critical hydrogen-extract airflow in battery rooms.
4. Key Achievements & Verified Outcomes
- HV facility HVAC verified
- Substation
- Airflow & Pa balanced
- ±10%
- Substation TAB dossier
- Certified