TAB Works at Amiral Project

Testing, Adjusting & Balancing (TAB) · United Caravan Trading & Contracting Co. (UCTC) · Jubail

Testing, Adjusting & Balancing (TAB)·Job #26/1/1075/1·Jubail, KSA·2026
TAB works at Amiral Project Jubail, UCTC

1. Assignment Overview

Comprehensive HVAC Testing, Adjusting and Balancing (TAB) executed for TAB Works at Amiral Project in Jubail on behalf of United Caravan Trading & Contracting Co. (UCTC). Field teams measured, adjusted, and verified air distribution systems, fan performance, and building pressurization in accordance with industrial project specifications.

2. Scope of Work & Deliverables

  • Review of approved IFC mechanical drawings, AHU/FCU/fan schedules, and site testing readiness checklists
  • Measurement of fan total airflow, external static pressure (ESP), fan RPM, motor voltage, and running amperage
  • Proportional balancing of supply, return, and exhaust air terminals across all designated buildings and control rooms
  • Verification of control room positive pressurization, fresh air make-up rates, and extract fan duty points
  • Preparation of complete TAB handover dossiers including terminal data sheets, marked-up drawings, and valid instrument calibration certificates

3. Field Challenges & Engineering Solutions

Industrial & Oil/Gas Site Compliance

Mobilization and daily field operations adhered strictly to industrial gate-pass, Job Safety Analysis (JSA), LOTO, and work-at-height requirements.

Multi-System Witness Testing

Balancing logs were organized building-by-building and system-by-system to facilitate smooth joint witness verification with main contractor QC and supervising consultants.

4. Key Achievements & Verified Outcomes

Industrial field deployment
Jubail
Design airflow tolerance
±10%
Full TAB handover report
Approved