TAB Works at Amiral Project
Testing, Adjusting & Balancing (TAB) · United Caravan Trading & Contracting Co. (UCTC) · Jubail
.1920w.webp)
1. Assignment Overview
Comprehensive HVAC Testing, Adjusting and Balancing (TAB) executed for TAB Works at Amiral Project in Jubail on behalf of United Caravan Trading & Contracting Co. (UCTC). Field teams measured, adjusted, and verified air distribution systems, fan performance, and building pressurization in accordance with industrial project specifications.
2. Scope of Work & Deliverables
- Review of approved IFC mechanical drawings, AHU/FCU/fan schedules, and site testing readiness checklists
- Measurement of fan total airflow, external static pressure (ESP), fan RPM, motor voltage, and running amperage
- Proportional balancing of supply, return, and exhaust air terminals across all designated buildings and control rooms
- Verification of control room positive pressurization, fresh air make-up rates, and extract fan duty points
- Preparation of complete TAB handover dossiers including terminal data sheets, marked-up drawings, and valid instrument calibration certificates
3. Field Challenges & Engineering Solutions
Industrial & Oil/Gas Site Compliance
Mobilization and daily field operations adhered strictly to industrial gate-pass, Job Safety Analysis (JSA), LOTO, and work-at-height requirements.
Multi-System Witness Testing
Balancing logs were organized building-by-building and system-by-system to facilitate smooth joint witness verification with main contractor QC and supervising consultants.
4. Key Achievements & Verified Outcomes
- Industrial field deployment
- Jubail
- Design airflow tolerance
- ±10%
- Full TAB handover report
- Approved

