HVAC Testing & Assessment Works at PIB Facility
Commissioning & Controls · United Caravan Trading & Contracting Co. (UCTC) · Ras Tanura

1. Assignment Overview
Technical inspection, airflow measurement, and operational assessment of the existing HVAC system serving the PIB building facility in Ras Tanura for United Caravan Trading & Contracting Co. (UCTC). The survey established baseline equipment performance and identified corrective actions to restore design ventilation and room conditions.
2. Scope of Work & Deliverables
- On-site diagnostic survey of supply, return, and exhaust air systems serving the PIB facility
- Measurement of actual supply and exhaust air volumes (CFM / L/s) using calibrated capture hoods and duct traverses
- Verification of room pressure differentials, air change rates, temperature, and relative humidity under operating load
- Inspection of AHU cooling coils, filters, fan drive components, and damper positions
- Submission of an engineering assessment report detailing measured performance versus design criteria and recommended rectifications
3. Field Challenges & Engineering Solutions
Live Facility Assessment
Measurements were recorded under representative operating conditions to capture actual airflow imbalances, static pressure losses, and room pressurization behavior.
Diagnostic Reporting
Provided clear, actionable engineering observations linking measured airflow deficiencies to specific damper, filter, or fan-drive constraints.
4. Key Achievements & Verified Outcomes
- System survey completed
- Baseline
- Field instrumentation
- Calibrated
- Assessment report issued
- Complete